Engineering Journal

Engineering Notes

A chronological record of Mooncoin Core maintenance work, release milestones, and reproducible verification progress.

infrastructure 2026-02-20

Mooncoin Electrum Server Online on Port 50002

Technical deployment log for Mooncoin Electrum service on port 50002, including validation scope, reliability boundaries, and integration impact for wallet and dev tooling.

protocol research 2026-02-18

Mooncoin and Litecoin Atomic Swap Research Notes

Technical research into Mooncoin-Litecoin atomic swap feasibility, covering HTLC script assumptions, wallet limitations, and practical node-level execution risks.

release ops 2026-02-14

Rebase Verification Pass Completed

Completed baseline verification against mainnet checkpoints and refreshed release artifacts for Linux and Windows targets.